Monday, January 11, 2016

And the Beat Goes On



Upon completing the study to our satisfaction, we have turned our efforts back to other areas of the house remodel.

Don is focusing on the main floor bathroom. He put two layers of cement backerboard down on the subfloor (needed, to get the final floor high enough to work with the toilet mounting flange). The old tile floor was installed over tongue and groove fir, which was removed in the demolition, and which was not a good surface for tile. The backerboard layers were installed with mortar and lots of screws.  Then ceramic porcelain tile was installed, also using mortar. It’s the same tile that we used in our upstairs bathroom, but a blue color instead of greenish. We are quite happy with how it turned out. The job was finished with grouting. Don forgot how messy grouting is. And to make the challenge bigger, that was done during icy weather. The garden hoses were frozen, making the frequent cleaning of buckets and tools more of a challenge. Don thinks he should be featured in a Ryobi ad...his tile saw has done two bathrooms, and our extended brick walkway, without missing a beat.

The color is "sapphire blue."

Don also reworked the door that used to be at the end of our funny angled hallway by the dining room, and installed it as the bathroom door. The old 24-in wide bi-fold door made most people uncomfortable in the old bathroom, as it wouldn’t close all the way. He installed the last of the trim for the door today, and will move on to the window trim and wainscoting in the bathroom.

Finally! a real door to our main floor bathroom.

Sami has continued her role as the color planner and painter. We have a hallway filled with paint cans. It’s been a challenge of sorts, but Sami has painted as details become complete enough to do so. Her next big project is to become a plaster repair expert, repairing cracks, which are all over the house. She did research and found a system (Big Wally’s) that enables re-bonding loose plaster to lathe, so that crack repairs are durable. She’s going to hone her skills by doing repairs in the main floor coat closet, which has big cracks in the plaster, and big sections that are loose. She is also reconfiguring the closet to make it more functional (moving the closet rod and adding organized storage).

Sami hopes to become the plaster repair Queen.

Sunday, January 3, 2016

Room Number Two - DONE

We didn't take any good "before" photos, but here are some "after" photos of the second room completed; our study. Don finished the last detail today; hanging the Venetian blinds. Twenty-four years ago, when we moved into the house, the room was paneled in dark knotty wood, had brown fabric shades, and a brown shag carpet and a built-in rough wood dresser. It served as Carl's bedroom. After Carl moved out, we pulled up the carpet and Don refinished the oak floor. We took out the built-in dresser and added bookcases. We painted over the wood paneling with a bright blue of Emily's choosing and exchanged the bed for a futon/couch. The room evolved over the years into our study, with the addition of an oak desk from Don's work that we rescued from being dumped (now Sami's desk), and the little roll top desk that was Don's father's desk (now Don's desk). Of course computers and printers and the tables that hold them have evolved. However, we both still prefer a desktop computer to a notebook or tablet. When we got serious about the remodel we switched out the futon for a large wardrobe, to make up for the lost closet space on the main floor that was being turned into part of the kitchen. Don ripped out the north wall, added insulation, and rebuilt it. Sami refinished some of the wood trim and Don rebuilt some. Sami gave everything fresh paint; "owl gray" for the walls, and a warm white for the trim. We are especially fond of the Venetian blinds because their horizontal lines contrast with the vertical lines of the now gray paneling.

It is a room where we spend a lot of time, and we are happy with its quiet, peaceful qualities. We may still hang a picture or two, but we are officially checking it off as COMPLETE!

Looking north to Sami's side.


Looking south-west to Don's area.





Tuesday, December 29, 2015

Step-By-Step

Our children very thoughtfully hosted Christmas; therefore we have not lost momentum on the remodel. Now that the project is ours we accomplish what we can each day and no more. The last thing Corey did was install cabinets, so our "galley" has finally returned.

Old houses are not entirely square, so there is a shim here and there.
We are eager to add floor, tile back splash, and appliances. But first the counter top people must do their work.
The reality is we move ahead step-by-step and will probably be at it for two or three more months. Currently Don is laying the sub-floor in the main floor bath room and preparing the door to that room. He has "re-purposed" the door that before joined the little diagonal hallway and the front entry. With the new floor plan it is no longer needed.

Sami painted her "Eldon" desk four and a half years ago (see entry May 26, 2011). One of her first remodel projects. Finally, the last touch has been added; the cushions!

Since we will continue to use our basement kitchen for several more months, Sami covered the temporary counters, which were beginning to suffer from all of the use, with some bright oil cloth that was a Christmas gift from Claudia.

Sami can remember when it was standard practice to cover rental house counters with oil cloth

Friday, December 18, 2015

On the First Day...

Christmas may be only seven days away, but our big countdown started last Wednesday when the cabinets were delivered, a total of 22 big boxes. Corey was here yesterday to lay out lines for positioning the cabinets on the kitchen walls using his laser leveling system.  He's back today to finish unpacking and finish the lines on the walls.  Don is helping with the two-person stuff. 


Sami has painted the kitchen walls "Lapland," a soft olive green in preparation. Corey and an associate will install the cabinets over the weekend, and Corey will return next week to work on the two custom cabinets that will be inserted into the walls


The quarter-sawen oak looks and smells lovely. Pretty nice Christmas gift!

This cabinet will go over the range hood









Friday, December 4, 2015

None of the Above


Don searched everywhere for the old window trim that he had stored when he installed the new windows five years ago, but could not find the trim for the upstairs front windows. So he bought new material and built new trim and sills. Of course he spotted the old trim right after he had finished building the new - leaning against his work bench!

Way back in 2011, at the beginning of the project, we put new windows in the study and tried to figure out what color we wanted the paint that room. We sampled several greens and yellow-golds on the wall, but didn't really like any of them (see entry 5/5/2011). Now, five years later, we have decided to go in a different direction and chose a gentle, warm-gray called "gray owl." What made us decide on gray is the fact that we love the gray in the bathroom and wanted to continue the theme throughout the upstairs.


Our plan is to paint all the rooms in the house and we have come up with a color scheme that flows from room to room. The salesman at the Benjamen Moore paint store is getting to be a close acquaintance!

Sami put in an 8 hour day painting the study. Its about half done.

Thursday, November 19, 2015

First Finished Surface



About two weeks ago a silence descended upon our house; one we had not heard for several months. All of the contractors left along with their drilling and sawing and banging. The silence signaled a dramatic change, at least for a while. The project is now OURS. Time for a whole bunch of sweat equity.


Don has been diligently working on the surfaces in the bathroom and polishing up the uneven spots with mud, putty knives, and primer. 

We haven't seen the green wallpaper for about 25 years.

 We have made many trips to the paint store and we have two finished surfaces to show for all of the work. The front door is finished, inside and out and the dining room ceiling and upper trim is done.

Our worn, old front door looks much better.
Painting the inside brightens up the entryway.
Ceiling and molding are done!

Other elements of the remodel are moving forward too. the cabinets are in a queue to be built and should arrive the middle of December. We had to revisit the back splash tile design about four times, as the space for it morphed more than once, because drawings we were working with did not reflect the realities of our range, hood and cabinets. We’re excited about the final product. It is full of lovely fruits, vegetables and little animals; including a snail and a mouse. Eeek! We have selected products for the kitchen counters and floor as well as the bathroom floor.

We have selected a manufactured quartz for the counter tops and a vinyl tile for the floor.


Sunday, November 1, 2015

Our Turn



The flurry of activity last week made very visible progress. With the sheet rock all in place, the space is defined. The new under-layment for the floor in the kitchen means that room is sealed off. We can no longer see into the basement through the knotholes and gaps in the floor, nor can we see into the main floor bedroom and bath areas from the kitchen through the skeleton of naked framing.

Mid-way through matching the ceiling texture
Its a match!

The final step in the sheet rock job was to match the texture on the walls and ceiling from the old areas to the new. The dust from all of that work has settled (a LOT of dust!), and we find ourselves in the middle of a project that we now largely own. We have about six, or so, weeks to wait until the kitchen cabinets are ready to install. In that time we hope to do many of things that are on our sweat equity list. First we must spend a few days delivering our house from all of the white dust and grit left from the sheet rock work. After that, our list is long. Don has begun by refinishing the front door, giving the new walls a coat of primer, and repairing the several areas of the floor that have been damaged over the years or by the remodel. Sami has spent the last few days musing about colors to use throughout the house. The Benjamin Moore Web site has proved to be a very useful tool to visualize color combinations, and Powell’s Paint Center, just a few blocks away, has supplied many paint chip samples. The names given to the colors are as fun as the colors; “Lapland,” “Rustic Brick,” “Gentle Cream,” “Brittany Blue,” “Snowfall White.”

Some colors we are considering together with the kitchen tile and cabinet oak.

For the first time in quite a few months we can pull our cars into our driveway free and clear. Gone are the contractors cars and their port-a-potty, and gone is the old dishwasher. That was taken by the appliance store when the delivered our new refrigerator and dishwasher. The new is finally replacing the old. There is still lots of work ahead of us, but things are beginning to take shape.