Tuesday, April 12, 2016

172 Feet of Trim


We are almost done in the dining room. We counted! It has 172 feet of painted trim; around the doors, windows, ceiling, chair molding and base molding
Most of it is reused from before, except for the trim around the new, peninsula area opening. We have prepared all of it by sanding, detailing (Spackle, wood putty, etc), priming and painting. So, we have gone over every inch of it at least three times!

One trick Sami uses to sand all of the peaks and valleys is to use the small emery board cubes she is given when she gets a pedicure. They hold up really well and yet can be pushed into the little edges and rounded areas of the trim.

We hope to post a picture of the finished dining room very soon.

Sunday, April 10, 2016

Distractions

We took a hiatus from the remodel in order to work on "our" other house, the Library Cottage, for a few days last week. Plus, we have devoted a lot of time to the yard and garden because it has been unusually warm and sunny.

In spite of those things, the remodel inches along. Don has patched the floor and prepared the molding to go back in the dining room. Sami is fixing a few places in the walls to make it ready for paint.

"Before"

"After" There will be another "after" when the floor is refinished.

Summer seems just around the corner. We both feel we need to get a move on, in order to be done in the targeted time frame.

Wednesday, March 23, 2016

Negative Progress?

Somehow, this seems like negative progress; Don drilled forty three-inch holes in the main floor bedroom exterior walls in order to blow in insulation. EEEEE-gaads! We see a whole lot of hole-patching in our futures. The good news is that we found out that the dining room walls are already insulated. One has to wonder why some of the walls are insulated and some are not.


Today Don also got started on one of the more time-consuming projects; patching the hardwood floors where walls and floors were removed, and patches were made in the past.

The last reminent of the diagonal hallway.

And what is Sami up to? You guessed it - MORE sanding, priming and painting.


We figure that eventually we will remove all the bits we don't want, and add all the bits we do. These "bits" were planed off of a door that was sticking.

Sunday, March 20, 2016

A Whole Lot of Holes

Work continues. Sami has sanded, primed and painted the window trim in the dining room and main floor bedroom and painted the inside walls in that bedroom. Now that we can see the color on the walls, it was time to choose curtain fabric. We are continuing using red as an accent color. This fabric won, hands down.


The first big product purchase we made, way back, last summer was the kitchen range. It was a fantastic deal because it was an "open box" return at Best Buy. It had some dings and a bent bracket. Don ordered replacement parts, installed them, and fitted the range into place. The dishwasher was also a summer purchase and this week Don put it into its place. They will both come back out when he does the tile back splash and floor, but its good to see how they look in the kitchen.



Before we move on to finishing exterior walls, some of them must be insulated. After watching a bunch of videos about do-it-yourself blow-in insulation we decided that we will tackle that ourselves. So, Don is now drilling a hundred, or so, three-inch holes in the exterior walls of our bedroom, the main floor bedroom, and the living room. Once we have upgraded the insulation, several rooms can be finished. Its like putting together a great, big jigsaw puzzle; one piece at a time.


Tuesday, March 15, 2016

Up Days, Down(ish) Days

Don visits the Providence Cancer Center for treatment every other Thursday and he is usually slowed down for a day or two by the Velcade shot, a "targeted" cancer drug, he receives. In addition he takes another cancer treatment, steroid pills, every Thursday that has its own set of side effects; feeling buzzed and sleepless for a day and night and then extra tired. Some weeks the treatments don't slow him down too much, but sometimes they do. When they do, he works on a project that requires less energy output than some. The last "low energy project" he picked was installing the pull-handles on the kitchen cupboards and drawers. He put in several full days doing it, because the cabinets themselves required some work to make them as good as they can be. Don switched out some too-short screws and reinforced hollow drawer fronts along the way. He does a lot of work that is not visible. But, what you can see looks mighty nice, don't you think? It is also nice to know that they are structurally as good as they can be.




Sami continues to mud, sand, prime and paint. Some stretching exercises come as a bonus.


Tuesday, March 1, 2016

New Bathroom - FINISHED!


Yes, the new bathroom is done! Yea!!

Here are some views of the final product...



The rebuilt window lets in lots of light without providing a view inside.

Pedestal sinks are NOT designed for ease of installation and maintenance! Don learned new skills...mainly working with PEX plumbing, which was part of the faucet package. We both put in hours and hours of work on this one. Oliver has declared the new bathroom “his.” All have tested the toilet and sink, and Don tested the shower last night. Time for a day off.

Saturday, February 27, 2016

Almost There


We have been working for the last month on the main floor bathroom. Of all of the rooms it will be the most changed when we are done. It is a different shape and size than it was, and everything in it will be new. The one thing that remained the same; the window, had to be almost entirely rebuilt. Plus we installed a translucent, decorative pane of glass in the bottom. This room is also entirely our own layout and design. We are getting close to completion. Here are some photos of its evolution...

BEFORE: 
  • There was a funny little folding door that did not give people the maximum about of privacy.
  • The toilet was wedged between the shower and the wall, and the floor tiles around it were cracked.
  • The shower had a sliding glass door that shattered a few years ago.
  • The little sink did not give a good stream of water and was stained. The press board cabinet and the little wall-hung shelf unit were the only storage.


In this photo taken during the structual work in July, the old shower pan is visable in the lower right-hand corner. The entire wall between the bathroom and kitchen was removed down to the studs. One of the big challages was reworking the plumbing and electrical in this wall to accomodate the new ellements of both the bathroom and the kitchen. The north and west walls were also removed and rebuilt to add square feet to the bath.

In the last couple of posts there are photos of the bathroom's interior rebuild. The wainscoting and related trim took over a week to install. Don measured, built, and fitted each piece. It took tubes and tubes of adhesive and hours working on his knees.



 

Then it took lots of spackle and sanding.


Finally, after hours hammering brads in by hand, Don visited Harbor Freight and got a power tool that cut the time installing trim to a fraction of what it had been. Finally Sami primed and painted the wainscoting and touched up the blue wall where all of the work left problems - two more days of work!


Only 4 check marks (of the origional 40) are left; install quarter-round oak trim at the floor, install toilet, install sink, and intstall towel rods, etc. Can't wait!